Luckily day 2 was shorter than day 1, but we still got a ton done. As I noted in the previous post, we bolted down the floor frame to the trailer itself. After that was done, we finished up the foam board insulation by layering on a thinner sheet over the 2 3/4 inch sheetsContinue reading “Build Day 2 (4/8/12)”