We had another trip to prepare for, so in went the stairs/ladder and we finished up the exterior paint (aside from the door and touch-ups). After getting back from the northern VA adventures, it was time to finish the propane lines! Finally we could test the water heater, oven/stove, and the Newport P9000. As muchContinue reading “Early October Progress”
Tag Archives: Caulking
Build Day 37 (8/2/12)
The good news is that I’m finally caulking the siding and trim and whatnot. The bad news is that it’s a very tedious task! After 2 of us working on it for about 3 hours, I think we’re 1/2 done with it. We went all around the window and door trim and in EVERY seamContinue reading “Build Day 37 (8/2/12)”
Build Day 24 (6/3/12)
A short workday but we managed to install the front door. It’s steel with a venting window to help cool down the house since I’m not putting in A/C. The original plans called for two windows on either side of the door, but I really wanted to use the space on the inside for storageContinue reading “Build Day 24 (6/3/12)”